After the TABA, we reach a milestone that often decides whether a renewal project happens at all: the designation (hachraza). It governs the project's tax benefits, the handling of refusing residents — and in practice, much of the project's economic feasibility. Understanding it helps developers, owners and investors plan with confidence.

What is the designation process?

A legal stage in which a defined complex is designated a pinui-binui (evacuate-and-rebuild) or densification complex — giving the project statutory status and access to tax benefits and other incentives. A single building under the Shaked Alternative gets no designation at all: its tax benefits come straight from the Real Estate Taxation Law.

A shared lawn between older apartment buildings in a housing development in the morning: sprinklers running, a jacaranda in bloom, bicycles by a wall, a woman walking the path with shopping bags
A complex is more than one building. The designation declares it a pinui-binui complex, gives the project statutory status, and opens the door to the tax benefits. A single building under the Shaked Alternative gets no designation at all.

The two main designation tracks in pinui-binui

  • The developer track (the name that stuck is the 'taxation track'): the developer applies to the Government Authority for Urban Renewal to designate the complex — and with it come the significant tax benefits that make the project economically feasible. Since November 18, 2021, there has been a single designation under the Government Authority for Urban Renewal Law; the two tracks differ only in who applies, and the benefits are the same.
  • The municipal track: the local authority initiates and applies for the designation — bringing government support, resources, professional tools and tax benefits, and enabling wide-scope projects tuned to the community's needs.

Why the designation matters — seven effects

  • Legal, planning and economic certainty — a clear framework that raises every party's confidence.
  • Tax benefits for the owners: appreciation-tax exemption on selling the existing rights to the developer (per the statutory conditions) in exchange for the new apartment; purchase-tax exemption on receiving the new apartment; and typically zero-rate VAT on it.
  • Tax benefits for the developer: purchase-tax relief on acquiring the rights, income-tax reliefs and expense offsets, VAT reliefs and deferral on the exchange apartments and construction services, and betterment-levy reliefs — often the difference between a project that pencils and one that doesn't.
  • Faster advancement — designated complexes often receive priority at the local authority and the planning institutions.
  • Institutional support — professional, legal and planning assistance from the Government Authority and the municipality.
  • A stronger special majority and tools against unreasonable refusers: the majority may apply to court to compel a refuser without a reasonable ground to join — and to charge them compensation for the delay's damages.
  • Better access to financing — designated projects read as government-backed, easing public and private funding and accelerating the developer's sales.
An older woman in a blue cotton dress pulling the shutter strap beside a window in an old apartment, looking out at green trees, sunlight on the terrazzo floor
The special majority is the owners who want to move forward. The designation strengthens their standing: they may apply to court to compel a refuser without a reasonable ground to join, and to hold them liable for the damage the delay causes.

The statutory conditions for requesting designation

  • Planning: a detailed plan deposited for objections by the competent institution, enabling demolition or densification of at least 24 existing units, toward building the greater of double the existing units or at least 70 units.
  • Pinui-binui agreements: the developer signed with a special majority — owners holding at least two-thirds of the apartments in the pinui-binui cluster (all the buildings the deal covers), and in each building at least three-fifths of the apartments and more than half of the attached common property (in a building of 4 or 5 apartments: at least 3 apartments and more than two owners).
  • The municipality's position: the local authority consented to the designation (or the conditions of Section 14(a1) of the Government Authority for Urban Renewal Law are met).
Morning sun through a wall of ribbed glass blocks in the stairwell of an older apartment building, a dry leaf and water drops on the concrete ledge, an iron handrail and terrazzo below
The stairwell is common property, and the majority is counted there too. Designation needs a deposited detailed plan, the municipality's consent, and a special majority: two-thirds of the apartments in the complex, and in each building three-fifths of the apartments and more than half of the common property.

The designation's five steps

  1. 1Initiating the project — by the owners or a developer, and assembling the special majority.
  2. 2Filing the application with the Government Authority for Urban Renewal — the complex's details, the proposed development plan and the required documents.
  3. 3Examination and preliminary approval — the Authority reviews the economic, planning and social feasibility; a preliminary approval can be requested for the tax benefits, allowing reporting to the Tax Authority to defer the tax-liability date (the preliminary approval does not guarantee designation).
  4. 4The designation itself — published in the official records, announcing the complex's new status.
  5. 5Approvals and execution — permits, guarantees, conditions precedent, relocation, demolition and construction.
A community vegetable garden between two apartment buildings in a housing development at midday: raised beds of tomatoes and peppers, sunflowers, a pomegranate tree, a crate of picked vegetables, and a woman in a straw hat picking basil
The process can be initiated by the owners themselves or by a developer. The first step: assembling the special majority.
A new public garden on a renewed street in late-afternoon light: ping-pong tables, fresh turf, a red bike lane, a stone bench, and new apartment buildings with planted balconies behind
For the owners, the designation brings a new apartment, a renewed neighborhood, and rising value.

The bottom line

The designation gives the project a legal and planning frame — and the tax benefits that make it possible: for investors, a lower-risk, higher-certainty environment; for owners, not only a new apartment but a renewed neighborhood and rising value. Understanding the critical stages — the designation chief among them — is the key to leading the project with confidence and wisdom.

We're with you at every stage of urban renewal, from the first decision to the keys — so your interests are protected and the agreement works for you.

The above is initial information only and does not constitute legal advice or a substitute for it. Consult an attorney who practices in the field before taking any action.

A question about this in your own file? Write to us — you will get an answer on the merits, not a brochure.

A preferred source just means you'll see our new articles more often in Top Stories next time you search a topic like this. It's also a nice way to say thanks.

Add as a preferred source on Google (opens in a new tab)

General information — not legal advice.

How to start

A conversation with an urban renewal lawyer, wherever you are in the process.

An apartment you're buying or selling, a building entering renewal, or a contract waiting on a decision. Leave a name and a number and a senior lawyer on the team will call you back: we hear you out and tell you what the next step is — even when it isn't with us.

Your details go straight to the firm, and the person who calls you back is a lawyer on the team. We keep your details only to get back to you about this inquiry. We send marketing material only if you checked the box above.

Call us — we answer in personMessage us on WhatsApp